Products __
Youngpoong's unique underwater exploration and inspection robot
An underwater inspection robot equipped with a high-performance underwater camera
• Underwater inspection
• Inspection Image Manager
• Max. operation depth, 30m
• Applied at Saewool NPP
ROVINS = ROV(Remotely Operated Vehicle) + INSPECTION
IRWST : In-containment Refueling Water Storage Tank
Securing driving stability
Automatic Depth & direction control
No time limit for inspection
Real-time visual inspection and constant
inspection results recording
Pan-Tilt-Zoom Camera for inspection coverage
VT quality : ASME Code VT-3
Visibilty in dark environments
Max. operation depth, 30m
Operation status : 40°C / 1000rad
(Radiation proof test)
ROVINS-V1 is a submarine specialized
in image measurement.
It is an underwater robot optimized for underwater inspection and exploration. Real-time visual inspection and regular inspection results can be recorded using the PTZ inspection camera.
The Marine Robot Center from the Korea Institute of Industrial Technology certified the product’s ability to measure water depth, the product’s propulsion, velocity, and communication distance
ROVINS is an operations and control system for underwater robots.
Capture Pictures of V1 control program
Capture Pictures of V1 control program
Capture Pictures of V1 control program
ROVINS-V1 Configuration
(IRWST Inspection Robot)
Diameter | Height | Weight in Air | Maximum speed | Thrust |
680mm | 1150mm | 27kg | 1.5Knot | 4.5kgf |
Visual inspection of the refueling water storage tank and related accessories in the reactor building
Visual inspection of the refueling water storage tank and related accessories in the reactor building
Visual inspection of the refueling water storage tank and related accessories in the reactor building
Visual inspection of dam intake bar screen
Visual inspection of dam intake bar screen
Visual inspection of dam intake bar screen
- Minimize the risk of safety accidents and improve efficiency
- No drainage/replenishment procedures required
- Reduction of maintenance cost
Reduce worker radiation exposure/
Minimize the risk of safety accidents and improve efficiency
Improved inspection reliability
with digital data
More than 8 hours of continuous work
No drainage/replenishment procedures required
Contract Name | Quantity (SET) | Contract Date | Delivery date | Delivery to | Remarks |
IRWST of Shin-Kori Units 3 and 4, Internal Visual Inspection Robot | 2 | 2018-01-22 | 2018-03-06 | Korea Hydro & Nuclear Power Co., Ltd. Saeul 1 | Delivery completed |
Technical Team Drone Han River Hydropower Headquarters Facilities | 1 | 2019-11-19 | 2019-12-31 | Korea Hydro & Nuclear Power Co., Ltd. Han River Headquarters | Delivery completed |
Shin-Hanul Units 1 and 2 Internal Visual Inspection Underwater Robot | 2 | 2022-05-16 | 2022-09-15 | Korea Hydro & Nuclear Power Co., Ltd. Sinhanul 1 | Delivery completed |
IRWST of Saeul Units 3 and 4 Underwater Robot For Internal Filter Inspection | 2 | 2022-12-27 | 2023-05-01 | Korea Hydro & Nuclear Power Co., Ltd. Saeul 2 | Delivery completed |
Inspection | Date | Location | Frequency |
Visual inspection of the refueling water storage tank and related accessories in the reactor building | 2018~2023 | Korea Hydro & Nuclear Power Co., Ltd. Hanbit 3 | 8 times |
Visual inspection of the Paldang Dam intake bar screen | 2019-07-19 | Korea Hydro & Nuclear Power Co., Ltd. Han River Headquarters (Paldang Dam) | 1 time |
Visual inspection of Hanul 2 Power Plant RWST | 2019-10-18 | Korea Hydro & Nuclear Power Co., Ltd. Hanul 2 | 1 time |
Visual inspection of the intake bar screen of the Uiam Dam | 2020-11-04 | Korea Hydro & Nuclear Power Co., Ltd. Han River Headquarters (Uiam Dam) | 1 time |
Visual inspection of Muju pumped storage spillway screen | 2021-03-23 | Korea Hydro & Nuclear Power Co., Ltd. Han River Headquarters (Muju Pumped Storage) | 1 time |
Visual inspection of the Chuncheon Dam intake bar screen | 2021-08-17 2023-05-31 | Korea Hydro & Nuclear Power Co., Ltd. Han River Headquarters (Chuncheon Dam) | 2 times |
Visual inspection of the refueling water storage tank and related accessories in the reactor building of Shin-Hanul unit 1 and 2 | 2022~2023 | Korea Hydro & Nuclear Power Co., Ltd. Sinhanul 1 | 3 times |
Address : 21, Hwajeonsandan 6-ro 102beon-gil, Gangseo-gu, Busan, Republic of Korea Tel : +82-51-303-2782 Fax : +82-51-301-5661 Mail : sales@iyp.co.kr
Copyright (c) Young Poong. All Rights Reserved.
About Us
PR Center
Customer Support
Address : 21, Hwajeonsandan 6-ro 102beon-gil, Gangseo-gu, Busan, Republic of Korea
Tel : +82-51-303-2782
Fax : +82-51-301-5661
Mail : sales@iyp.co.kr